POR QUÉ CE INTERIM
Construido por operarios.
Con la confianza de los consejos.
No desempeñamos papeles. Dirigimos misiones.
25+
Países a través de Valtus Alliance
DÓNDE OPERAMOS
Despliegue ejecutivo provisional
en los 5 continentes.
De Europa al Golfo, pasando por las Américas: altos cargos desplegados localmente.
5
Continentes y crecimiento
¿Necesita un liderazgo ejecutivo interino en un mercado específico?Hable con un socio regional
PARA DIRECTIVOS INTERINOS
Su próximo mandato
empieza aquí.
CE Interim conecta a altos ejecutivos interinos con mandatos de alto impacto en Europa, América y Oriente Medio.
60,000+
Ejecutivos interinos en nuestra red mundial
CENTRO DE CONOCIMIENTO
Ideas de los operadores,
no los observadores.
Editorial, investigación e inteligencia de ejecutivos que han estado en la sala.
25k+
Lectores mensuales

EXECUTIVE LEADERSHIP · INTERIM PMI & CARVE-OUT DIRECTOR

An Interim Integration or Carve-Out Director with authority across both organisations.

CE Interim appoints proven Interim Integration and Carve-Out Directors to take control when a transaction has closed, the synergy case is intact on paper, and execution has stalled between two organisations that do not yet know who decides.

Confidencialidad desde el primer contacto. Un ejecutivo previamente seleccionado y que se ajusta al perfil del puesto, listo para incorporarse en un plazo de 72 horas tras la finalización del informe del mandato.

La línea jerárquica

BOARD · INVESTOR · STEERING COMMITTEE

↑
respuestas a

INTERIM INTEGRATION OR CARVE-OUT DIRECTOR

↓
directs across both

ACQUIRING ORGANISATION | ACQUIRED ORGANISATION

Finance · Operations · Systems · People · Commercial

Ownership across both organisations
Day One accountability
Disponibilidad en 72 horas
GOBERNANZA DIRIGIDA POR LOS SOCIOS

1,500+

Encargos entregados al año en toda la alianza

90+

Socios operativos en todo el mundo

30+

Países incluidos

95%

Mandatos transfronterizos

72 horas

Desde el informe inicial hasta el inicio de la misión

Definición

What is an Interim PMI or Carve-Out Director?

An Interim PMI and Carve-Out Director is an experienced executive appointed for a defined period to own the execution of an integration or a separation. The mandate covers governance, workstream sequencing, dependency management, benefits ownership and Day One readiness, with decision authority across both organisations rather than advisory input to either.

On paper, integration looks straightforward: synergy targets, functional workstreams, day-one checklists. Execution can depart quickly from that script. Existing leadership stays but authority shifts. Nobody is sure who decides. Systems launch before teams are ready. Governance becomes a reporting exercise rather than a decision-making one.

These are not process failures. They are leadership vacuums, and by the time integration pain surfaces, value is already being lost through delay, duplication and unresolved dependencies.

Condiciones de activación de citas

When businesses appoint an Interim Integration or Carve-Out Director

01

The deal has closed and nobody owns what happens next

The steering committee meets. Workstream leads report. No single person has the authority to decide between two functions that disagree, so the decisions wait

02

Day One is fixed and readiness is not

A legal completion date is set. The processes that must work on day one, order to cash, payroll, planning, customer service, are not yet proven, and the date will not move.

03

Una escisión debe ser autosuficiente

A separated business needs its own systems, its own finance function and its own operating model, while continuing to serve customers from infrastructure it does not own.

04

The transitional services clock is running

The transitional services agreement sets critical service dates, dependencies and commercial terms. Extension can increase cost or create additional exposure depending on the agreement, so every service schedule is something the business must stand up before its exit date.

05

The synergy case has not become a plan

Targets exist and nobody owns them. There is no pipeline, no named accountability and no way to tell whether a saving has been realised or merely forecast

06

Systems were integrated before the operation was stable

A platform or reporting change has been pushed through while production, service or finance were still recovering from the transaction, and both are now at risk.

07

Two cultures are producing polite paralysis

Meetings are constructive, decisions are not implemented, and both organisations are protecting their way of working. Governance has become a reporting exercise rather than a decision-making one.

08

Separation and integration are running at once

A business is being carved out of one group and into another simultaneously, with both programmes competing for the same functional capacity and the same people.

¿Es este el asiento correcto?

Does the situation require an Interim Integration Director?

The determining question is whether the integration needs an owner with authority across both organisations, or whether it needs a function fixed inside one of them.

Appoint an Interim Integration or Carve-Out Director when:

Regla de decisión

When the transaction timetable is set and the execution risk is ownership rather than analysis, this is the appropriate appointment.

Cuando lo adecuado es desempeñar otra función

Where the integration problem is specifically financial, two ledgers, two reporting calendars, an unevidenced synergy case, an Interim CFO resolves it inside the finance function.

Where the operational models have to merge across sites, an Interim COO carries the authority.

Where the acquired business has no functioning leadership at all, an Interim CEO is the appointment and integration follows from it.

Where the workforce dimension is the risk, an Interim HR Director leads it. 

CE Interim define primero el mandato y, a continuación, recomienda la función.

Comparación de funciones

¿Qué puesto necesita la empresa?

Desplaza la tabla hacia los lados →

Director interino de Integración Interim CEO Interim CFO M&A advisory
Ámbito de aplicación The integration or separation programme The acquired business The finance integration The plan
Authority sits Across both organisations Inside one business Inside one function With the client throughout
Posee Sequencing, dependencies, benefits, Day One The business result Ledger, reporting, synergy evidence The recommendation
Nombrado cuando Nobody owns execution The business lacks a leader The numbers cannot be merged Before the deal
Ends when The operating model is stable and handed over Permanent leadership arrives The close runs cleanly The report is delivered
Hora de empezar En un plazo de 72 horas desde la presentación del escrito En un plazo de 72 horas desde la presentación del escrito En un plazo de 72 horas desde la presentación del escrito Depends on scope and engagement

Director interino de Integración

Ámbito de aplicación The integration or separation programme
Authority sits Across both organisations
Posee Sequencing, dependencies, benefits, Day One
Nombrado cuando Nobody owns execution
Ends when The operating model is stable and handed over
Hora de empezar En un plazo de 72 horas desde la presentación del escrito

Interim CEO

Ámbito de aplicación The acquired business
Authority sits Inside one business
Posee The business result
Nombrado cuando The business lacks a leader
Ends when Permanent leadership arrives
Hora de empezar En un plazo de 72 horas desde la presentación del escrito

Interim CFO

Ámbito de aplicación The finance integration
Authority sits Inside one function
Posee Ledger, reporting, synergy evidence
Nombrado cuando The numbers cannot be merged
Ends when The close runs cleanly
Hora de empezar En un plazo de 72 horas desde la presentación del escrito

M&A advisory

Ámbito de aplicación The plan
Authority sits With the client throughout
Posee The recommendation
Nombrado cuando Before the deal
Ends when The report is delivered
Hora de empezar Depends on scope and engagement

Modos de fallo

Por qué fracasan estas citas

The integration is sequenced by organisation chart instead of by deadline.

Workstreams are ordered by function because that is how the business is structured. In a carve-out the actual schedule is set by the transitional services agreement: every service the seller provides has an exit date, and extension can increase cost or create additional exposure depending on the agreement. Sequencing against exits rather than the organisation chart helps prevent avoidable service extensions and prolonged dependency on the seller.

Systems are integrated before the operation can absorb it.

Integrating systems before the operation is ready can disrupt the activity the synergy case depends on. The sequencing decision should therefore be based on operational readiness rather than on a fixed assumption that earlier is better. This ordering decision is consequential in an industrial integration and it belongs to one accountable person.

A steering committee is treated as an owner.

Governance without a decision-maker becomes reporting. Workstream leads escalate, the committee notes the escalation, and the decision returns to the same two functions who disagreed. Value leaks while unresolved decisions circulate between functions without an accountable decision-maker. 

Separation and integration are run as two programmes.

Where a business is being carved out of one group and into another, both programmes draw on the same functional capacity and the same people. Run separately they compete. Run as one dependency system with a single cadence they become steerable. 

Ámbito de competencia

What an Interim Integration Director mandate should include

A named sponsor and decision space, agreed before the start.

Whether the executive reports to the acquirer’s board, the sponsor or a steering committee determines what can be settled without escalation. Where two organisations disagree, referral upward is the failure this appointment exists to prevent.

Autoridad en materia de secuenciación.

The right to decide what happens in which order, including delaying a system, reporting or process change until the operation can absorb it. That authority is central to protecting business continuity during integration, and it must sit with one person. 

Authority across both organisations.

Direction of workstream leads on both sides, not only on the acquirer’s. Authority limited to only one side of the programme leaves critical cross-organisational decisions unresolved, so the mandate needs decision rights that reach across both organisations.

Ownership of the dependency view.

One issue queue, one dependency map, one cadence. Where separation and integration run in parallel, they are governed as a single system rather than as competing programmes.

Benefits accountability.

Ownership of the synergy pipeline, with named owners, validated actions and a measurement that distinguishes realised from forecast. 

Day One scope authority.

The right to define which processes must work on day one and to protect capacity for them, which necessarily means the right to say what does not happen yet.

Nota de autoridad

Authority must be proportional to the decisions the mandate requires in its first thirty days. In an integration, an unmade decision does not wait: the two organisations continue operating separately and the gap becomes permanent.

Responsabilidad legal, ámbito de aplicación y cobertura

Responsabilidad legal.

Where the mandate requires it, the executive may receive defined signature authority within the programme’s scope, delegated statutory duties or, where formally appointed and permitted by the local corporate structure, a statutory position. The scope is agreed before the start rather than assumed. In a carve-out, a separated entity may also require an accountable officer before permanent leadership is in place.

El alcance se acuerda antes de que el ejecutivo comience su labor.

The client, CE Interim and the executive define duties, boundaries and signature limits in writing.

El seguro se contrata por cada mandato.

Executives carry their own professional liability and directors’ and officers’ cover. On some mandates the client provides or contributes to it. CE Interim and every member of the Valtus Alliance carries its own cover as well.

Arco de mandato

How an integration or carve-out mandate unfolds

This programme runs to Day One and to service exit dates, not to a calendar.

01

Before Day One

Scope what must work

Define the small number of processes that have to function on day one and protect capacity for them. Build the dependency view across both organisations. Read the transitional services schedule as a project plan and map every exit date. Establish the cadence, the escalation route and who decides.

02

Day One to the first exits

Stabilise and start burning down

Hold run-the-business performance while the programme runs. Begin standing up the capabilities that replace transitional services, in the order the exit dates require. Convert the synergy case into a validated pipeline with named owners. Surface critical issues early through a working escalation route.

03

Through the exits to steady state

Integrate what is ready

Sequence the deeper integration work, systems, reporting and operating model, against operational readiness rather than against enthusiasm. Retire the programme structure as functions take ownership. 

INTEGRATION MANDATE · 9 TO 18 MONTHS

In CE Interim’s experience, the opening weeks are used to establish one decision cadence, one dependency view and one escalation route. Total duration depends on the transaction structure, operational readiness, the transitional-services schedule and the scale of the integration.

CARVE-OUT MANDATE · TO THE LAST SERVICE EXIT

Where a business is standing alone, the horizon is set by the transitional services agreement rather than by readiness.

Habla con un socio sobre el mandato antes de que la situación te obligue a definirlo.

Resultados y traspaso

What effective integration leadership should achieve

Day One holds

The processes that had to work on day one worked, and run-the-business performance did not degrade while the programme ran.

One decision route

Both organisations escalate to the same place and get an answer, rather than to two places and get two.

Exits made, not allowed to drift

Transitional services are replaced against the agreed schedule rather than extended by default.

Benefits owned

The synergy case has become a pipeline with names against it and a measurement that distinguishes realised from forecast.

An operating model, not a project

The combined or separated business runs on a structure it can sustain rather than on a programme office.

Entrega

Clean documentation, team alignment and a stable operating model, transferred to named people inside the business. You choose whether that is a permanent handover or continued interim support.

A quién enviamos

The Interim Integration and Carve-Out Directors we appoint

Has run an integration to a fixed Day One.

Not advised on one. Has carried accountability for a date that could not move, with customer-facing processes that could not be allowed to degrade as it approached.

Has managed a transitional services exit.

Knows that the agreement creates critical dates, dependencies and commercial constraints, and has stood up replacement capability against those exit dates. Has also handled extension or renewal decisions where the agreement created additional cost or exposure.

Has held authority across two organisations at once.

Directing workstream leads on the acquirer’s side and the acquired side, neither of whom report to them, and getting a decision when the two disagree. Experience directing both sides matters because critical integration decisions often sit between the two organisations rather than wholly inside either one.

Has said no to a go-live.

Has delayed an integration milestone where operational readiness did not support it, and defended the sequencing decision to a steering committee. Sequencing judgement is central to this seat.

Has carried a synergy number, not reported on one.

Has owned a benefits case with names against each line and a measurement that distinguished realised from forecast, in front of an investor who was checking.

CE Interim works through more than 90 operating partners across the Valtus Alliance, in over 30 countries. Where a workstream requires additional specialist leadership, CE Interim can draw from the wider Valtus Alliance network.

El modelo de citas

From confidential briefing to appointment

01

Resumen de la situación

A Partner conversation under NDA. Where the transaction stands, what has stalled, what Day One requires, and what authority can be delegated across both organisations.

02

Definición del mandato y evaluación específica de los retos

CE Interim defines the scope, the sponsor, the decision space and the first objectives, then interviews each executive for this transaction and this stage rather than against a generic integration profile.

03

Presentación, nombramientos y gobernanza

You receive a small number of genuinely relevant executives, not a CV list. Weekly Partner check-ins and milestone tracking follow, and additional specialists can be deployed midstream where a workstream needs one. 

Tensión transfronteriza

Why cross-border integrations are harder to govern

What the acquirer needs

What the acquired business needs

The plan is written where the acquirer sits and executed where the business operates. Local constraints may not be visible in the central programme until they affect execution, so the integration leader needs enough credibility on both sides to surface them early and to be told the truth by each.

Ámbitos en los que trabajamos con mayor frecuencia

De Alemania a Polonia
De Alemania a la República Checa y Hungría
De Europa Occidental a Europa Central y Oriental
De Europa Occidental a Estados Unidos
De Estados Unidos a Europa Central
Inversión de capital riesgo internacional en una empresa local de la cartera

Módulos de situación

Typical integration and carve-out mandates

Integración posterior a la fusión

The transaction has closed and execution has stalled between two organisations that do not yet know who decides. The mandate is to establish ownership, sequence the work and hold run-the-business performance while it happens.

Carve-Out and Separation

A business must stand alone against a deadline set by the transaction, while still running on infrastructure it does not own. The mandate is sequenced against transitional service exit dates.

Programas de transformación de importancia crítica para la empresa

A systems or reporting integration has been pushed ahead of operational readiness. The mandate is to re-sequence it against what the operation can absorb.

Gobernanza, visibilidad y control

The synergy case exists and nobody owns it. The mandate is to convert targets into a pipeline with names, actions and a measurement that survives scrutiny.

Entornos sectoriales

Where CE Interim appoints integration and carve-out leadership

Sectores primarios

Fabricación e industria
Automoción
Aeroespacial y Defensa
Farmacia, ciencias de la vida y dispositivos médicos

Transaction environments

Private equity bolt-on and platform deals
Corporate divestment and carve-out
Cross-border acquisition of a family-owned busines
Joint venture separation

Entornos de propiedad

Empresas de la cartera de capital riesgo
Grupos empresariales y sedes internacionales
Empresas del «Mittelstand» y grupos industriales del mercado medio
Participaciones industriales

Es importante conocer el sector. El criterio de selección determinante es una responsabilidad de liderazgo comparable en una situación comparable, en un entorno de propiedad comparable.

Pruebas del caso

Integration mandates in practice

Global materials group · Present in more than thirty countries · Intervention in Czechia · Integration into an existing East European cluster

Acquired Czech entity brought into a European cluster

Situación

A recently acquired Czech business had to be brought into the group’s existing regional structure.

Mandato

Financial consolidation, monthly reporting, governance and treasury, alongside the cross-cultural work that determines whether an integration is adopted or merely announced. Scoped at twelve to twenty-four months.

Resultado

The acquired business was integrated into the European cluster under a common reporting, governance and treasury framework. Local management moved from standalone practices to group-aligned routines, giving headquarters clearer visibility and the Czech operation a more stable basis for operating inside the wider organisation.

Cross-border industrial group · Intervention in Germany · Industrial manufacturing · Post-merger integration

Reporting cadence rebuilt after a German acquisition, 90 days

Situación

Two organisations had merged without their reporting following. 

Mandato

Establish a unified reporting cadence and bring synergy execution back on track.

Resultado

Within ninety days a unified cadence was established and reporting delays fell by more than half, with early cost savings, and the function transitioned to steady state under the new holding company. 

Coste y duración

What an integration or carve-out mandate costs and how long it runs

Los mandatos se facturan según una tarifa diaria en función del alcance, la autoridad y la duración. No se aplica ningún porcentaje sobre el salario, ni comisión por colocación, ni inversión inicial. Se pagan los días trabajados según lo acordado en el mandato, y la tarifa se confirma antes de que el ejecutivo comience a trabajar. 

Tarifa diaria orientativa

1.000 € – 3.000 €

Mayor cuando el encargo conlleva un cargo regulado por ley o presenta complejidades transfronterizas.

Duración y hitos

Integration mandate

De nueve a dieciocho meses

Decision cadence established

In the opening weeks

Directivo presente en las instalaciones

En un plazo de 72 horas tras la finalización del informe

¿Qué influye en la cifra?.

The number of countries and legal entities in scope. The duration of the transitional services agreement and how many schedules have to be exited. Whether separation and integration run in parallel. Whether systems integration sits inside the mandate. Every mandate is delivered on site.

Con qué se debe comparar.

No es el coste del mandato, sino el coste de que la situación se prolongue sin un ejecutivo que rinda cuentas, mientras se aplazan las decisiones.

Lo que realmente vas a pagar.

Un socio te da una cifra en la primera conversación confidencial. Sin coste alguno ni compromiso alguno.

Preguntas

Questions boards and investors ask

Trabajan en colaboración. La página de servicios explica cómo CE Interim organiza los programas de integración y escisión. Esta página trata sobre el directivo responsable de la ejecución: la autoridad de la que debe disponer y cómo se lleva a cabo su nombramiento.

Director de integración cuando las empresas ya existen y el programa carece de un responsable. Consejero delegado cuando la empresa adquirida carece por completo de un equipo directivo operativo, en cuyo caso la integración se deriva del nombramiento del equipo directivo y no al revés.

Una consultora suele ofrecer análisis, diseño de programas y recomendaciones. Un director de integración interino cuenta con autoridad ejecutiva delegada para tomar decisiones sobre la secuencia de acciones, las dependencias y el «Día Uno» dentro de su mandato, y es responsable de la ejecución en ambas organizaciones.

Often, yes. Workstream leads may remain in their functional reporting lines while the sponsor delegates programme decision authority to the interim, which is why the mandate has to be explicit. The sponsor and the decision space are agreed before the

executive starts.

Porque ese es el calendario real. Cada servicio que presta el vendedor tiene una fecha de finalización, y cualquier prórroga puede aumentar el coste o generar riesgos adicionales, según lo establecido en el acuerdo. Planificar las fases en función de esas fechas de finalización, en lugar de hacerlo según el organigrama, es lo que determina si el programa llega a buen puerto.

Los sistemas deben integrarse cuando la preparación operativa lo permita. En algunas operaciones, esto puede comenzar pronto; en otras, debe posponerse. Forzar un cambio en la plataforma o en la presentación de informes mientras la empresa aún se está recuperando de la operación perturba la actividad en la que se basa el argumento a favor de la sinergia. Decidir el orden de las cosas es una de las responsabilidades fundamentales de esta función.

Sí. Cuando una línea de trabajo requiera un liderazgo específico, se puede incorporar a un responsable de transición de sistemas o a un director de integración de RR. HH., además del director de integración de la red general.

CE gestiona los mandatos de personal interino en un marco de relación entre empresas, y el ejecutivo interino no se incorpora a la empresa del cliente como empleado fijo. La parte contratante es una entidad local o un centro regional, en función del país de intervención, seleccionada de entre más de treinta entidades de la Alianza Valtus. La situación laboral, las obligaciones fiscales, de seguridad social y otras obligaciones relacionadas dependen de la jurisdicción, la estructura contractual y las circunstancias del encargo, por lo que la contratación se adapta al país en el que se realiza el trabajo.

El seguro se contrata para cada mandato. El ejecutivo cuenta con su propia cobertura de responsabilidad civil de directivos y de responsabilidad profesional, y en algunos mandatos es el cliente quien la proporciona o contribuye a ella. CE Interim y todos los miembros de Valtus Alliance también cuentan con su propia cobertura. El alcance de la responsabilidad, los límites y los límites de firma se acuerdan por escrito entre el cliente, CE Interim y el directivo antes de que este último comience a desempeñar sus funciones.

Siempre que la legislación lo permita y el calendario lo permita, el nombramiento antes del cierre puede mejorar la preparación para el «Día Uno». El trabajo previo al cierre debe respetar las restricciones en materia de control de fusiones, legislación de competencia, confidencialidad y transacciones, de modo que los derechos de decisión sobre la empresa objetivo sigan estando debidamente limitados hasta el cierre y hasta que se obtengan las autorizaciones necesarias. Tras el cierre, el mandato pasa de la fase de planificación a la de ejecución. Un director de integración designado antes del cierre puede definir adecuadamente el alcance del «Día Uno», interpretar el calendario de servicios de transición como un plan de proyecto y poner en marcha la gobernanza desde el primer día de la adquisición. Cuando el nombramiento se produce solo después del cierre, es posible que el ejecutivo tenga que establecer primero la gobernanza, resolver las dependencias pendientes y aclarar las decisiones que no se habían tomado durante la preparación.

El equipo ejecutivo es responsable del proceso y de la medición. El área de negocio se encarga de la ejecución de cada línea, con un responsable designado para cada una. Mantener separadas estas responsabilidades ayuda a evitar que el programa se convierta en el único lugar donde recae la responsabilidad.

The opening weeks are used to establish one dependency view, one issue queue and one escalation route. The mandate itself runs longer, with duration driven by the integration scope and any transitional-services exit schedule.

Clean documentation, team alignment and a stable operating model, handed to named people inside the business. You choose whether that is a permanent handover or continued interim support.

Integration value does not disappear at once. It leaks while everyone waits for a decision.

Habla directamente con un socio interino de CE sobre la situación de liderazgo, el mandato y la autoridad necesaria. La conversación es confidencial y no te compromete a aceptar ningún nombramiento.

Respuesta de los socios en un plazo de 24 horas. Se da prioridad a las situaciones urgentes relacionadas con el liderazgo.

CE INTERINO

Plataforma de gestión interina de ejecutivos

Soy un..

Cliente / Empresa

Contratación de directivos interinos

Director interino

En busca de mandatos