PREČO CE INTERIM
Zostavené prevádzkovateľmi.
Dôveryhodný pre rady.
Neplníme úlohy. Vedieme misie.
25+
Krajiny prostredníctvom Valtus Alliance
KDE PÔSOBÍME
Dočasné výkonné nasadenie
na 5 kontinentoch.
Od Európy cez Perzský záliv až po Ameriku - vyšší vedúci pracovníci nasadení na mieste.
5
Kontinenty a rast
Potrebujete dočasné výkonné vedenie na konkrétnom trhu?Obráťte sa na regionálneho partnera
PRE DOČASNÝCH VEDÚCICH PRACOVNÍKOV
Váš ďalší mandát
začína tu.
CE Interim spája vedúcich pracovníkov s vysokým vplyvom na mandáty v Európe, Amerike a na Blízkom východe.
60,000+
Dočasní riadiaci pracovníci v našej globálnej sieti
KNOWLEDGE HUB
Poznatky od prevádzkovateľov,
nie pozorovatelia.
Editoriál, výskum a informácie od vedúcich pracovníkov, ktorí boli v tejto miestnosti.
25k+
Mesační čitatelia

EXECUTIVE LEADERSHIP · INTERIM CIO

An Interim CIO with authority over the systems and the vendors.

CE Interim appoints proven Interim CIOs to take charge of technology when an implementation has failed, a platform has become unstable, a separation requires a standalone stack, or the IT function has lost its leadership.

Dôvernosť od prvého kontaktu. Preverený manažér, ktorý spĺňa požiadavky zadania a je pripravený nastúpiť do 72 hodín od dokončenia zadávacieho listu.

Hierarchická štruktúra

CEO · CFO · BOARD

↑
odpovede na

INTERIM CIO

↓
vedie

SYSTEMS · INFRASTRUCTURE · DATA · SECURITY · IT TEAM

Systems under control
Vendor accountability
Partner-led governance
72-hour readiness

1,500+

Počet zadaných zákaziek za rok v rámci aliancie

90+

Prevádzkoví partneri po celom svete

30+

Zahrnuté krajiny

95%

Cezhraničné mandáty

72 hodín

Od zadania až po začiatok misie

Definícia

What is an Interim CIO?

An Interim CIO is an experienced technology executive appointed for a defined period to take control of the systems the business
depends on: the platform estate, the implementation programme, the vendors delivering it, the data, the security posture and the
IT function itself.

The appointment is made when technology has become a business risk rather than a business function. That can mean an
implementation that has stalled, a platform that is not stable, a separation that requires standing up a stack from nothing, or a
departure that has left the function without direction at the worst moment.

An Interim CIO is accountable for whether the systems work, not for whether the business changes how it uses them. Where the risk is adoption rather than delivery, a different appointment is the right one.

Spúšťače udalostí

When businesses appoint an Interim CIO

01

An ERP implementation has stalled or been paused

The programme is behind, over budget, or has stopped. Restarting it needs someone who will take the decisions the original programme avoided and hold the implementation partner to what was contracted.

02

A system went live and the business cannot rely on it

Month-end will not close cleanly, the shopfloor is working around the system, and the data coming out of it is not trusted by the people who have to act on it.

03

The CIO has gone and the estate has no owner

Departure or extended absence. Continuity, security, vendor contracts and the live programme all continue regardless. In CE Interim’s experience a permanent appointment takes three to five months, and the appointee then serves notice before inheriting
an estate they have to learn.

04

A carve-out needs its own stack

A separated business is running on systems it does not own, under a transitional services agreement with exit dates and escalating renewal costs. Replacement capability has to be stood up against those dates.

05

Two acquired estates have to become one

Duplicate platforms, incompatible data structures and two IT teams. The consolidation case exists and nobody is sequencing it against what the operation can absorb.

06

A security incident has exposed the posture

A breach, a near miss or an audit finding has shown that the controls were assumed rather than verified, and the response needs executive ownership rather than a remediation list.

07

Vendors are running the agenda

Contracts, scope and timelines are being set by implementation partners because nobody internal has the standing or the technical depth to challenge them.

08

The data is not fit for what the business now wants to do

Reporting, analytics or automation initiatives are stalling on data quality, ownership and governance that were never established.

Je toto to správne sedadlo?

Does the situation require an Interim CIO?

The determining question is whether the technology is the problem, or whether the technology works and the business has not changed around it.

Appoint an Interim CIO when:

Pravidlo rozhodovania

When the risk is whether the systems work, appoint a CIO. When the systems work and the business has gone back to its old process, the risk is adoption and a different appointment addresses it.

Keď je tá správna práve iná úloha

 Where the programme spans functions and the question is whether the organisation adopts the change, an Interim Transformation and Programme Director carries the mandate and the CIO supports the technical delivery inside it.

Where the failure is that finance cannot produce reliable numbers, an Interim CFO leads and technology is one input

Where a system change has destabilised a plant, an Interim Plant Manager restores operational control while the system question is resolved separately. 

CE Interim najprv stanovuje mandát a až potom odporúča úlohu.

Porovnanie rolí

Which role does the business need?

Posuňte tabuľku do strany →

Interim CIO Dočasný riaditeľ pre transformáciu a programy Interim CFO Implementation partner
Vlastní Systems, vendors, security, the IT function The programme and its adoption Reporting, cash, governance The build
Risk addressed The system does not work The change does not embed The numbers cannot be trusted Delivery to contract
Úrad Held, inside technology Borrowed, across functions Held, inside finance Contractual
Menovaný v čase, keď Technology has become a business risk Nobody owns delivery end to end Finance needs executive authority The scope is defined
Accountable to CEO, CFO or board The programme sponsor Board or sponsor The contract
Čas začať Do 72 hodín od doručenia zadania Do 72 hodín od doručenia zadania Do 72 hodín od doručenia zadania Once a statement of work is signed

Interim CIO

Vlastní Systems, vendors, security, the IT function
Risk addressed The system does not work
Úrad Held, inside technology
Menovaný v čase, keď Technology has become a business risk
Accountable to CEO, CFO or board
Čas začať Do 72 hodín od doručenia zadania

Dočasný riaditeľ pre transformáciu a programy

Vlastní The programme and its adoption
Risk addressed The change does not embed
Úrad Borrowed, across functions
Menovaný v čase, keď Nobody owns delivery end to end
Accountable to The programme sponsor
Čas začať Do 72 hodín od doručenia zadania

Interim CFO

Vlastní Reporting, cash, governance
Risk addressed The numbers cannot be trusted
Úrad Held, inside finance
Menovaný v čase, keď Finance needs executive authority
Accountable to Board or sponsor
Čas začať Do 72 hodín od doručenia zadania

Implementation partner

Vlastní The build
Risk addressed Delivery to contract
Úrad Contractual
Menovaný v čase, keď The scope is defined
Accountable to The contract
Čas začať Once a statement of work is signed

Způsoby poruchy

Prečo tieto stretnutia zlyhávajú

The ERP problem is treated as an IT problem.

A CIO is appointed to fix a failing implementation, and does. The platform stabilises, the interfaces work, the data flows. The business continues to operate the way it did before, because nobody was accountable for changing that. The system is now correct and unused, which is more expensive than either outcome alone.

The rollout is restarted with the governance that failed it.

The programme is relaunched with a new plan, the same steering structure, the same decision route and the same reluctance to say no to scope. Restarting without changing why it stalled risks producing a second stall for the same underlying reasons. 

A separation is sequenced by preference rather than by exit date.

Systems are replaced in the order the team would prefer to tackle them, rather than in the order the transitional services agreement requires. The result is renewal at escalating cost for the services nobody got to in time. 

The vendor is treated as a partner rather than a counterparty.

Scope, timeline and acceptance are set by the implementation partner because nobody internal has the technical depth to challenge them. The programme delivers what was easy to deliver, and the business discovers the gap at go-live.

Rozsah právomocí

What an Interim CIO mandate should include

Vopred dohodnutá hierarchická štruktúra podriadenosti.

Whether the executive reports to the CEO, the CFO or the board determines what can be decided without referral, and in a recovery the referral interval is where the cost accumulates.

Architecture and platform authority.

The right to decide what is built, bought, retained or retired. A recovery mandate that excludes the architecture decision is a mandate to manage a problem rather than to resolve it.

Vendor accountability.

The executive is the counterparty to implementation partners, with authority over scope, change control, escalation and acceptance. Acceptance in particular belongs to the business rather than to the party being paid to deliver.

Authority to stop and re-scope.

The right to pause a workstream, remove scope or delay a go-live where the business cannot absorb it. Recovery often requires less to be delivered rather than more.

Security and continuity ownership.

Accountability for the posture as it actually is rather than as documented, including the authority to act on what an assessment finds. 

Authority over the IT function.

The ability to reallocate responsibility, address capability gaps and hold internal and external teams to the same standard.

Poznámka vydavateľa

Authority must be proportional to the decisions the mandate requires in its first thirty days. In a stalled implementation the daily cost continues while approval is sought, and the vendor keeps invoicing throughout.

Zákonná zodpovednosť, rozsah a krytie

Zákonná zodpovednosť.

Where the mandate requires it, the executive may receive defined signature authority over contracts, change control and acceptance, delegated statutory duties or, where formally appointed and permitted by the local corporate structure, a statutory position. The scope is agreed before the start rather than assumed.

Rozsah prác sa dohodne ešte pred začatím realizácie.

Klient, spoločnosť CE Interim a vedúci pracovník písomne stanovujú povinnosti, rozdelenie povinností, hranice pôsobnosti a limity podpisového práva. Pri nástupe do funkcie sa nepredpokladá žiadna právomoc ani zodpovednosť.

Poistenie sa uzatvára na základe poverenia.

Dočasní vedúci pracovníci majú vlastné poistenie zodpovednosti členov predstavenstva, vedúcich pracovníkov a profesijnej zodpovednosti. Pri niektorých zákazkách toto poistenie zabezpečuje alebo naň prispieva klient. Spoločnosť CE Interim a každý člen Valtus Alliance má takisto vlastné poistenie.

Oblúk mandátu

How an Interim CIO mandate unfolds

Usually appointed into something already running. A common pattern, not a fixed methodology.

01

Taking control

Establish the real state

Separate what is reported from what is true: programme status, platform stability, data quality, security posture and vendor position. Identify what is at immediate risk, whether that is a go-live, a service exit or an exposure. Stop anything that is making it worse. 

02

Stabilising

Decide and re-scope

Take the architecture and scope decisions the programme has been deferring. Reduce delivery to what the business can absorb and what the timetable genuinely requires. Reset the vendor relationship: scope, change control, escalation and acceptance criteria in writing. 

03

Rebuilding

Deliver and hand over

Complete the delivery on the revised scope. Establish the operating model, the support structure and the governance the permanent function will inherit. Brief the successor on what was found as well as what was fixed.

RECOVERY OR SEPARATION MANDATE · 9 TO 18 MONTHS

Decision authority and recovery cadence are established inside thirty days. In CE Interim’s experience, three months is the minimum period in which meaningful change can usually be demonstrated, because a platform only proves it is stable by closing consecutive periods on it.

Náhrada za voľné pracovné miesto · 6 až 12 mesiacov

Where the mandate holds the estate through a gap, the mandate runs to the permanent appointment

Porozprávajte sa s partnerom o mandáte skôr, než vám ho situácia sama určí.

Výsledky a odovzdanie

What effective interim technology leadership should achieve

Stabilita

The systems the business runs on behave predictably, and the people who depend on them stop building workarounds.

Trusted data

 The numbers coming out of the system are the numbers the business acts on, without parallel spreadsheets.

Vendors under contract

Implementation partners deliver to agreed scope, and acceptance is a business decision rather than a formality.

A defensible posture

Security and continuity reflect what has been verified rather than what was assumed.

A function that can be led

The IT team has structure, ownership and a standard, so the permanent CIO inherits an organisation rather than a backlog. 

Odovzdanie

The architecture decisions, the vendor position and the operating model are documented and transferred to named people. Continuity without dependency.

Koho vysielame

The Interim CIOs we appoint

Has recovered an implementation, not only run one.

Has taken over a programme that was already failing, decided what to cut, and delivered the remainder. Recovery requires a different judgement set from steady-state delivery.

Has stood up a stack against a separation deadline.

Knows that a transitional services agreement is the schedule, has replaced services against exit dates, and has been in the renewal conversation where the cost escalates.

Has held an implementation partner to contract.

Has challenged scope, refused an acceptance and renegotiated a change control with a vendor whose commercial interest ran the other way. Acceptance is a business decision, and the willingness to withhold it is what makes the contract mean anything.

Understands what the plant actually does.

Production, quality and planning systems behave differently from commercial ones. A technically correct solution can still fail operationally if it does not fit how the shopfloor actually works.

Has said no to a go-live date.

Has delayed a launch because the business was not ready, held that position against a programme timeline and a vendor invoice, and been right.

CE Interim works through more than 90 operating partners across the Valtus Alliance, in over 30 countries. Where a workstream needs an additional specialist midstream, CE Interim can draw one from the same network.

Model menovania

Od dôverného brífingu po vymenovanie do výkonnej funkcie

01

Informácia o situácii

 A Partner conversation under NDA, typically with a Partner who has held a technology leadership role. Where the programme or estate stands, where execution is broken, and what authority can be delegated.

02

Mandate definition and challenge-specific assessment

 CE Interim defines the systems in scope, the stage, the blockers and the critical outcomes, then interviews each executive for this situation rather than against a generic technology profile.

03

Presentation, appointment and governance

You receive one or two pre-vetted executives matched to the challenge, not a CV list. Weekly Partner check-ins and milestone tracking follow. 

Cezhraničné napätie

Why cross-border technology mandates are harder to govern

What headquarters needs

What each site needs

Local teams may not escalate a platform decision they disagree with. They can adopt the parts that fit and work around the rest, and the workaround becomes the process. An Interim CIO has to be present enough at the sites to see what is actually being used.

Oblasti, v ktorých najčastejšie pracujeme

Z Nemecka do Poľska
Z Nemecka do Česka a Maďarska
Zo západnej Európy do strednej a východnej Európy
Zo západnej Európy do Spojených štátov
Zo Spojených štátov do strednej Európy
Medzinárodný private equity pre miestnu spoločnosť v portfóliu

Situačné moduly

Typical Interim CIO mandates

Transformačné programy kľúčové pre podnik

An implementation has stalled or gone live without stabilising. The mandate is to take the deferred decisions, reduce scope to what is achievable, and deliver a platform the business can rely on.

Integrácia po fúzii a vyčlenenie

A separated business needs its own systems against fixed exit dates, or two estates have to consolidate. The mandate is sequenced against the transitional services agreement rather than preference.

Kľúčová voľná pozícia vo vedení

The technology function has no owner while continuity, security and a live programme all continue. The mandate is to hold the estate and hand over cleanly.

Governance, Visibility and Control

Security posture, data governance or vendor management have become risks the board can see and nobody owns. The mandate is to make the position verifiable.

Prostredia jednotlivých sektorov

Where CE Interim appoints Interim CIOs

Primárne odvetvia

Výroba a priemysel
Automobilový priemysel
Letecký a obranný priemysel
Farmaceutický priemysel, biovedy a zdravotnícke pomôcky

Podávané tiež

Chemikálie
Spracovanie potravín a nápojov
Energia
FMCG
Logistika
Stavebníctvo a nehnuteľnosti
Technológie a médiá

Vlastnícke prostredia

Spoločnosti v portfóliu súkromného kapitálu
Koncerny a medzinárodné centrály
Stredné podniky a priemyselné skupiny strednej veľkosti
Priemyselné koncerny

Sector understanding matters because a manufacturing estate carries production, quality and planning systems that behave differently from a purely commercial environment, and technically sound decisions can still fail operationally if they do not fit how the plant actually works.

Dôkazy v prípade

Technology mandates in practice

Global materials group · More than 150 years of history · Present in more than thirty countries · Intervention across ten Polish sites

Group ERP template deployed across ten locations in Poland

Situácia

A group ERP template was being rolled out into the Polish entities as part of a wider group transformation, governed centrally and delivered locally through an implementation partner, against a fixed go-live.

Mandát

CE Interim appointed an interim executive to own the programme locally: holding the partner to scope, coordinating ten sites with different operating realities, and getting the business ready rather than only the system.

Výsledok

The rollout moved from a centrally driven system implementation to a locally owned business programme. Ten sites were brought into one governance cadence, the implementation partner was held to scope, and readiness issues were resolved before they could become go-live failures. Local management entered the transition with clear accountability for adoption, not just technical delivery.

European industrial manufacturer · Food, pharmaceutical and defence markets · Publicly listed group · Around 200 people

Finance systems stabilised after an ERP go-live at a Czech site

Situácia

 A new ERP platform had gone live and, in the words of the brief, had gone worst in finance. The close had become dependent on workarounds, the team was producing by hand what the system should have produced, and the finance leader had departed in the middle of it.

Mandát

Stabilise the reporting inside the system as implemented, and separate what finance could fix from what required the platform to change. 

Výsledok

The finance function was brought back under control without waiting for a complete ERP redesign. Reporting was stabilised inside the live system, manual workarounds were reduced, and the remaining platform defects were isolated and assigned clearly. Management regained dependable financial visibility while the business continued operating.

Náklady a trvanie

What an Interim CIO mandate costs and how long it runs

Cena za zverenie úlohy sa stanovuje ako denná sadzba na základe rozsahu, právomocí a trvania. Neplatíte žiadne percento z platu, žiadny poplatok za sprostredkovanie ani žiadnu počiatočnú investíciu. Platíte za dni odpracované v rámci dohodnutého zverenia úlohy a sadzba sa potvrdí ešte predtým, ako vedúci pracovník začne pracovať.

Orientačná denná sadzba

1 000 € – 3 000 €

Väčší v prípadoch, keď mandát zahŕňa zákonnú funkciu alebo cezhraničnú zložitosť.

Trvanie a míľniky

Recovery or separation mandate

Nine to eighteen months

Zastupovanie pri absencii

Šesť až dvanásť mesiacov

Decision authority and recovery cadence established

Inside thirty days

Vedúci pracovník na mieste

Do 72 hodín od odovzdania zadania

Čo ovplyvňuje túto hodnotu.

The scale of the estate and the number of sites and countries on it. Whether a recovery, a separation or a consolidation is in scope. Whether vendor renegotiation sits inside the mandate. Whether the security posture has to be re established rather than reviewed. Every mandate is delivered on site.

Voči čomu by sa to malo merať.

Not the cost of the mandate, but the cost of the situation continuing without an accountable executive while decisions are deferred.

Koľko skutočne zaplatíte.

Partner vám počas prvého dôverného rozhovoru poskytne cenovú ponuku. Bez poplatku, bez záväzkov.

Otázky

Questions boards and sponsors ask

CIO where the risk is whether the systems work. Transformation Director where the systems work and the risk is whether the business adopts the change. Many programmes need both, with the mandates defined so they do not overlap.

Not for this role and not for transformation. The market reads CTO as Chief Technology Officer, and CE Interim writes roles out in full rather than using an acronym that attracts the wrong reader.

Yes, and it is a common mandate. Restarting successfully means changing why it stalled, not relaunching the same plan with a new date. That may require cutting scope and resetting the vendor relationship.

Yes, as the counterparty rather than as a coordinator. Scope, change control, escalation and acceptance sit with the business, and acceptance in particular is not a decision to leave with the party being paid to deliver. 

That changes the mandate rather than ending it. Where the existing IT team has the capability but lacks leadership or decision authority, the interim leads the team already in place and focuses the mandate on direction, governance and execution.

For industrial businesses, yes. Production, quality and planning systems behave differently from commercial ones, and decisions taken without that understanding are worked around on the floor regardless of their technical merit.

It should. Recovery often requires delivering less rather than more, and the authority to remove scope or delay a go-live has to be part of the mandate rather than an escalation.

CE Interim structures mandates on a business-to-business basis, and the interim executive does not join the client as a permanent employee. The contracting party is a local entity or a regional hub depending on the country of intervention, drawn from more than thirty entities across the Valtus Alliance. Employment-status, tax, social-security and related obligations depend on the jurisdiction, the contracting structure and the circumstances of the mandate, so the engagement is structured for the country in which the work is performed.

Insurance is arranged per mandate. The executive carries their own directors’ and officers’ and professional liability cover, and on some mandates the client provides or contributes to it. CE Interim and every member of the Valtus Alliance carries its own cover as well. The scope of responsibility, the boundaries and the signature limits are agreed in writing by the client, CE Interim and the executive before the executive starts.

A vetted, mandate-matched executive is ready to start within 72 hours of the completed mandate brief. Where a workstream needs an additional specialist midstream, CE Interim can draw one from the same network.

It can be. Recovery normally starts by establishing why the programme is behind, what the business can realistically absorb and whether the current scope is still defensible. That may mean cutting scope, resetting the vendor relationship and re-sequencing delivery around operational readiness rather than the milestone chart. Relaunching the same plan without addressing the reasons it stalled risks repeating the same failure.

The interim executive, as the counterparty rather than a coordinator. Scope, change control, escalation and acceptance all sit with the business. Leaving acceptance with the party being paid to deliver is how programmes go live on paper and fail in use.

A deliberate handover. Architecture decisions, the vendor position and the operating model are documented and transferred to named people, so the permanent CIO inherits an organisation rather than a backlog.

When CIO authority is missing, delay becomes a decision in itself.

Porozprávajte sa priamo s dočasným partnerom spoločnosti CE o situácii vo vedení, o mandáte a o potrebných právomociach. Rozhovor je dôverný a nezaväzuje vás k prijatiu tejto pozície.

Odpoveď partnera do 24 hodín. Naliehavé situácie týkajúce sa vedenia majú prednosť.

CE INTERIM

Platforma pre dočasný manažment výkonných pracovníkov

Som..

Klient / spoločnosť

Prijímanie dočasného vedenia

Dočasný manažér

Hľadanie mandátov